5800m³ Blast Furnace of Jiangsu Shagang Group located in Zhangjiagang City (Jiangsu Province) is the world largest effective volume iron making system . The project went into production in 2009. MCC undertook engineering design and construction of the project.......
2x70 Batteries 7.63m Coke Oven in Shougang Jingtang located in Caofeidian Industry Zone (Tangshan, Hebei Province) went into production in 2007. The height of Coke Oven is 7.63m and designed Capacity is 1,050,000t/a. MCC undertook the EPC contract of the project.......
Intedgrated Steel Plant Project of Taiyuan Steel aided by Chinese Government is the largest integrated iron and steel enterprise in north Vietnam. The porject is under construction. MCC undertook EPC contract of the project.......
EPC Contract for 360㎡ Sinter Plant of Shaoguan Steel located in Shaoguan (Guangdong Province) was completed and went into production in 2005.This project won excellent EPC project award of the metallurgical industry ministry. MCC undertook the EPC contract of the project......
UGML 450m³ Blast Furnace and 75㎡ Sinter Plant Project (India) is a new milestone in India market for MCC. The final acceptance certificate was issued in 2012. MCC undertook EP contract of the project.......
450m³ Blast Furnace and 75㎡ Sinter Plant of SESA (India), belongs to SESA GOA, Which is the biggest private iron ore producer and exporter in India. The contract was signed in 2009 and the project commissioned in 2012. MCC undertook EP contract of the project.......