Kuala Lumpur W-HOTEL and Serviced Apartment Project Post date: 2015-09-07View:215

The construction includes a 55-floor refined decoration hotel and a serviced apartment. The project is in downtown Kuala Lumpur, which is only 300 meters away from the Kuala Lumpur twin towers. The above-ground main building is 230 meters high , and will become another l......

Kuala Lumpur Manjiale first-phase Apartment Project Post date: 2015-09-07View:130

The first phase of the project is the continuing construction of a 32-floor apartment. The floor area of each floor is about 1300 square meters . The construction mainly includes the top structure and decoration engineering of the parking lot, the more than 28- layer st......

Kuala Lumpur Manjiale second-phase Apartment Project Post date: 2015-09-07View:111

The second phase of the project includes a 38-floor apartment with floor area of 57,000 square meters. The project started on August, 2014 and lasted for 36 months.......

Selangor Tropicana Apartment and Block A、Block B of Office Building Project Post date: 2015-09-07View:62

The construction includes an apartment which is 40-floor high and an 18-floor office building. The floor area is 118,000 square meters. Tropicana high-rise apartment project won the gold award of 10th MOSHAPA OSH EXCLLENCE AWARDS.......

Johor Baru Country Garden Golden Bay 3D and 3F Apartment Project Post date: 2015-09-07View:56

The construction includes a 15-floor F1 apartment, a 19-floor F2 apartment , a 21-floor F3 apartment , a 28-floor D1 apartment , a 30-floor D2 apartment. The floor area is 150,000 square meters. It started on September 1th, 2014 and lasted for 29 months.......

Johor Baru Paragon Apartment Project Post date: 2015-09-07View:70

The construction includes two 33-flour apartments, which flour area is 90,000 square meters . The project is located on the main pass between Malaysia and Singapore .The project started on April 1th, 2014 and lasted for 30 months.......

Kuala Lumpur Sunway VELO 3R1 &3R2 Apartment Project Post date: 2015-09-07View:84

The construction includes two 31-flour apartments , which height is 115.789 meters and area is 120,000 square meters. The project started on September ,2014 and lasted 31 months.......

Johor Baru Iskandar Hotel and Seviced Apartment Project Post date: 2015-09-07View:93

The construction includes a 35-flour hotel and serviced apartment, which totally has 583 rooms, two 27-flour hotels which totally have 322 rooms and 3-flour Commercial building that has 188 stores. The construction will start on December, 2015 and will last 32 months.......

Terengganu HaiHe Bridge Project Post date: 2015-09-07View:106

The bridge connects the capital of Terengganu state and an important a river ,which has a dual function of highway traffic and water navigation. And it is about 1 km away from the estuary. The four-lane bridge is 632 miles in length and the main span is 489 meters long, ......

Indonesia Shanghai Sanlin  iron ore Project Post date: 2015-09-07View:58

The project includs the construction of a ore-dressing plant , a dry plant and long duct tape machine, the supply and installation of steel. The project started on September 1th, 2015, and will complete on April 30th, 2016.......