The construction includes a 55-floor refined decoration hotel and a serviced apartment. The project is in downtown Kuala Lumpur, which is only 300 meters away from the Kuala Lumpur twin towers. The above-ground main building is 230 meters high , and will become another l......
The first phase of the project is the continuing construction of a 32-floor apartment. The floor area of each floor is about 1300 square meters . The construction mainly includes the top structure and decoration engineering of the parking lot, the more than 28- layer st......
The second phase of the project includes a 38-floor apartment with floor area of 57,000 square meters. The project started on August, 2014 and lasted for 36 months.......
The construction includes an apartment which is 40-floor high and an 18-floor office building. The floor area is 118,000 square meters. Tropicana high-rise apartment project won the gold award of 10th MOSHAPA OSH EXCLLENCE AWARDS.......
The construction includes a 15-floor F1 apartment, a 19-floor F2 apartment , a 21-floor F3 apartment , a 28-floor D1 apartment , a 30-floor D2 apartment. The floor area is 150,000 square meters. It started on September 1th, 2014 and lasted for 29 months.......
The construction includes two 33-flour apartments, which flour area is 90,000 square meters . The project is located on the main pass between Malaysia and Singapore .The project started on April 1th, 2014 and lasted for 30 months.......
The construction includes two 31-flour apartments , which height is 115.789 meters and area is 120,000 square meters. The project started on September ,2014 and lasted 31 months.......
The construction includes a 35-flour hotel and serviced apartment, which totally has 583 rooms, two 27-flour hotels which totally have 322 rooms and 3-flour Commercial building that has 188 stores. The construction will start on December, 2015 and will last 32 months.......
The bridge connects the capital of Terengganu state and an important a river ,which has a dual function of highway traffic and water navigation. And it is about 1 km away from the estuary. The four-lane bridge is 632 miles in length and the main span is 489 meters long, ......
The project includs the construction of a ore-dressing plant , a dry plant and long duct tape machine, the supply and installation of steel. The project started on September 1th, 2015, and will complete on April 30th, 2016.......